- Renewable ramps. A 600 MW drop in solar output within 15 minutes is no longer unusual, and the dispatch has to follow it at the time step of the operation.
- Reserve activation. Primary response acts within seconds and secondary response within minutes, so the dispatch has to hold the right reserves at every interval.
- Storage cycling. Batteries earn their value from arbitrage within the hour, between energy and ancillary services. An hourly schedule does not price it.
NCP captures this value by running the short-term dispatch at the resolution each decision requires, with the same system representation used by SDDP.

SDDP