PSR
SDDP Platform
SDDP Platform · Operation planning

SDDP

Stochastic operation planning in SDDP 19

SDDP computes the operating policy of hydro, thermal, renewable and storage systems under uncertainty, over months and years. SDDP 19 adds new models for battery cycling and self-discharge, and a new cut management engine in early access.

Inside SDDP 19
01Early access

Cut management engine Early access

More scenarios and more iterations improve the quality and the robustness of the SDDP policy, but they also need more memory. SDDP 19 ships a new cut management engine as early access, so you can test it on your own cases.

The effort of the policy phase grows with the number of stages, scenarios and state variables, and with the cuts accumulated over the iterations. In a parallel run, every process keeps its own copy of the cuts, so memory also grows with the number of processes.

  • The processes on a computer share one copy of the cuts
  • Stages not in use leave memory
  • Cut files are saved in the background

It is available in SDDP 19 as an early access feature. Talk to our team to use it in a study.

One copy per process One shared copy Processes and their cuts Processes share the cuts
Illustration. With the new engine, the processes on a computer share one copy of the cuts.
02Modeling

Battery modeling

Battery degradation depends on how intensively a battery is used. SDDP 19 counts battery cycles, limits them and represents the energy lost while energy is stored.

Cycle counting

Partial cycles are weighted by their depth of discharge and converted into equivalent full cycles, with a linear approximation that keeps the optimization efficient. The cycle count is available in generic modeling.

Cycle limits

Limit the equivalent cycles within each weekly or monthly stage, over a year or over any period you define, with multi-stage generic constraints.

Self-discharge

Leakage is represented in the storage balance, so stored energy is lost over time and its value changes across time steps, in all chronological resolutions.

0% 50% 100% 0 1 2 Day 1 Day 2 Day 3 Day 4 Cycle limit for the stage Smaller cycle State of charge (left) Equivalent full cycles (right)
Illustration. Partial cycles count as fractions of an equivalent full cycle. Close to the limit of the stage, the battery cycles less.
0% 50% 100% 0 6 12 18 24 Time steps Stored energy Without self-discharge With self-discharge Energy lost
Illustration. With self-discharge, stored energy is lost over time even without discharging.
03Release

More improvements

Reserves in both directions

The time block representation now matches the hourly one: reserves can be provided upward, downward or in both directions.

Lighter and faster

Lower memory use and faster case loading, from changes in data handling and core components.

Names, codes and identifiers

Elements accept longer names and codes, and get unique identifiers that are created when a database is converted and can be edited to match your conventions. Most database files now use a CSV-based structure.

Compatibility. Databases converted to the SDDP 19 format cannot be opened in earlier versions. Keep a backup of your cases if you still need to work with a previous release.

Version 19.0

Get SDDP 19

Available for Windows and Linux.